Draft Supplement Environmental Assessment (EA) to evaluate Terminal B/C Redevelopment, Secure National Hall and Related Improvements project changes at Ronald Reagan Washington National Airport (DCA or the Airport).
Description
More Details
Notes
Also in this Series
Citations
Draft Supplement Environmental Assessment (EA) to evaluate Terminal B/C Redevelopment, Secure National Hall and Related Improvements project changes at Ronald Reagan Washington National Airport (DCA or the Airport) (Draft edition.).
Chicago / Turabian - Author Date Citation, 17th Edition (style guide)Draft Supplement Environmental Assessment (EA) to Evaluate Terminal B/C Redevelopment, Secure National Hall and Related Improvements Project Changes At Ronald Reagan Washington National Airport (DCA or the Airport). .
Chicago / Turabian - Humanities (Notes and Bibliography) Citation, 17th Edition (style guide)Draft Supplement Environmental Assessment (EA) to Evaluate Terminal B/C Redevelopment, Secure National Hall and Related Improvements Project Changes At Ronald Reagan Washington National Airport (DCA or the Airport) .
MLA Citation, 9th Edition (style guide)Draft Supplement Environmental Assessment (EA) to Evaluate Terminal B/C Redevelopment, Secure National Hall and Related Improvements Project Changes At Ronald Reagan Washington National Airport (DCA or the Airport) Draft edition.,
Staff View
Grouping Information
Grouped Work ID | fa0d7716-61ec-678c-50b0-6d777905ae8b-eng |
---|---|
Full title | draft supplement environmental assessment ea to evaluate terminal b c redevelopment secure national hall and related improvements project changes at ronald reagan washington national airport dca or th |
Author | metropolitan washington airports authority |
Grouping Category | other |
Last Update | 2024-10-08 10:55:34AM |
Last Indexed | 2024-11-22 03:56:18AM |
Book Cover Information
Image Source | default |
---|---|
First Loaded | Jul 30, 2024 |
Last Used | Nov 25, 2024 |
Marc Record
First Detected | Jul 23, 2021 03:28:43 PM |
---|---|
Last File Modification Time | Jun 24, 2024 09:33:12 PM |
Suppressed | Record had no items |
MARC Record
LEADER | 03414nmm a2200325 a 4500 | ||
---|---|---|---|
001 | MWAA001 | ||
003 | _ _ ‡aViAr | ||
005 | 20240624212952.0 | ||
008 | 07s2020 dcu eo d|c000 0 eng|c | ||
040 | |c via | ||
245 | 0 | 0 | |a Draft Supplement Environmental Assessment (EA) to evaluate Terminal B/C Redevelopment, Secure National Hall and Related Improvements project changes at Ronald Reagan Washington National Airport (DCA or the Airport). |
246 | 3 | |a Terminal B/C Redevelopment, Secure National Hall, and Related Improvements Draft Supplemental Environmental Assessment to include Relocatable Employee Parking at Ronald Reagan Washington National Airport | |
246 | 3 | |a Metropolitan Washington Airports Authority Environmental Assessment. | |
250 | |a Draft edition. | ||
300 | |a 1 online resource (103 pages :|b color illustrations, maps) | ||
336 | |a text|2 rdacontent | ||
337 | |a unmediated|2 rdamedia | ||
338 | |a volume|2 rdacarrier | ||
500 | |a Beginning May 15, 2020 the Draft Supplemental EA will be available for public review under the Environmental Information section of the Airports Authority website: https://www.mwaa.com/about/environmental-information. Due to public health concerns associated with the COVID19 pandemic, the document will not be made available for physical review at publicly accessible locations. For interested parties who do not have access to the internet, the Airports Authority will provide a hard copy of the Draft Supplemental EA. | ||
500 | |a The original EA analyzed the redevelopment of Terminal B/C, including the replacement of 14 existing regional aircraft hardstand positions with 14 contact gate positions at a newly constructed concourse connected to the north end of Terminal B/C (New North Concourse). Also included is the replacement of the existing three security screening checkpoints (SSCPs) at the connections between the National Hall and each Terminal B/C pier with two new SSCPs over the commercial and public vehicle arrivals level roadways and below the departures level roadways at the National Hall level. The project includes conversion of National Hall to a post-security secure area, allowing passengers to move between piers without having to pass through additional SSCPs. In order to accommodate the New North Concourse and Secure National Hall, the project includes demolition of two hangars and the Airports Authority's Corporate Office Building; modifications to the Central Utility Plant, airport security fence, and aircraft remain overnight parking locations; construction of new Taxiway N2; and removal of Taxiway S pavement from Runway 15-33 to Taxiway N. | ||
500 | |a This is a copy of a PDF document that can be accessed online. For access, please see the URL in this catalog record. | ||
610 | 2 | 0 | |a Ronald Reagan Washington National Airport|9 24582 |
650 | 0 | |a Airports|z Washington Metropolitan Area|x Planning. | |
650 | 0 | |a Airports|x Environmental aspects|z Washington Metropolitan Area. | |
690 | |a Ecollection|2 local. | ||
710 | 2 | |a Metropolitan Washington Airports Authority.|0 http://id.loc.gov/authorities/names/n88080445 |9 15528 | |
856 | 4 | 2 | |u https://www.mwaa.com/sites/default/files/final_draft_supplemental_ea_4_30_20.pdf|x Metropolitan Washington Airports Authority|z Computer file |
907 | |a .b20875484|b 05-22-20|c 05-07-20 | ||
998 | |a none|b 05-07-20|c m|d m |e -|f eng|g dcu|h 0 | ||
999 | |c 221542|d 221542 |