DC to Richmond Southeast high speed rail : tier II draft environmental impact statement : executive summary
(Adult Reference)

Book Cover
Average Rating
Published
Washington, D.C. : Federal Railroad Administration, 2017.
Status
Central - Adult Reference
R 385.22 UNITE v. 1
1 available
Central - Adult Reference
R 385.22 UNITE v. 2
1 available

Copies

volumeLocationCall NumberStatus
v. 1Central - Adult ReferenceR 385.22 UNITE v. 1Available
v. 2Central - Adult ReferenceR 385.22 UNITE v. 2Available

Description

Loading Description...

More Details

Published
Washington, D.C. : Federal Railroad Administration, 2017.
Format
Adult Reference
Physical Desc
2 volumes : color illustrations, charts, graphs and maps ; 28 cm
Language
English

Notes

General Note
"September 2017"
Description
The Project corridor is part of the larger Southeast High Speed Rail (SEHSR) Corridor which extends from Washington, D.C. to Charlotte, North Carolina; a Tier I evaluation of the larger SEHSR Corridor was completed in 2002. The DC2RVA project area extends 123 miles along an existing rail corridor owned by CSX transportation (CSXT) from south of the Long Bridge across the Potomac River in Arlington, Virginia, to Central Virginia in Chesterfield County, south of Richmond. It is a shared passenger rail and freight rail corridor, used by Amtrak, Virginia Railway Express (VRE), and CSXT.

Discover More

Also in this Series

Checking series information...

More Like This

Loading more titles like this title...

Citations

APA Citation, 7th Edition (style guide)

United States. Federal Railroad Administration. (2017). DC to Richmond Southeast high speed rail: tier II draft environmental impact statement : executive summary . Federal Railroad Administration.

Chicago / Turabian - Author Date Citation, 17th Edition (style guide)

United States. Federal Railroad Administration. 2017. DC to Richmond Southeast High Speed Rail: Tier II Draft Environmental Impact Statement : Executive Summary. Washington, D.C.: Federal Railroad Administration.

Chicago / Turabian - Humanities (Notes and Bibliography) Citation, 17th Edition (style guide)

United States. Federal Railroad Administration. DC to Richmond Southeast High Speed Rail: Tier II Draft Environmental Impact Statement : Executive Summary Washington, D.C.: Federal Railroad Administration, 2017.

Harvard Citation (style guide)

United States. Federal Railroad Administration. (2017). DC to richmond southeast high speed rail: tier II draft environmental impact statement : executive summary. Washington, D.C.: Federal Railroad Administration.

MLA Citation, 9th Edition (style guide)

United States. Federal Railroad Administration. DC to Richmond Southeast High Speed Rail: Tier II Draft Environmental Impact Statement : Executive Summary Federal Railroad Administration, 2017.

Note! Citations contain only title, author, edition, publisher, and year published. Citations should be used as a guideline and should be double checked for accuracy. Citation formats are based on standards as of August 2021.

Staff View

Loading Staff View.